CPP Mechanism Repair
Description of work
Thruster CPP was serviced during Passenger Ship DD. There was found an excessive wear of main CPP components: CPP Blades flanges, CPP Slider grooves, CPP Bronze Sliding Blocks, CPP Discs. All parts were delivered to Reneko workshop for repair.
Repair was done by mean of high precision CNC machining.
Repair has taken 5 days in total.
After sale
Thruster was succesfully assembled and installed back to the Ship. At present article moment (May 2017.) still in operation without known problems.